Showing posts with label Day Two Hundred Twenty 2011. Show all posts
Showing posts with label Day Two Hundred Twenty 2011. Show all posts

Monday, August 8, 2011

Day Two Hundred Twenty 2011

Hubby Neil is gearing up for phase two of the ceiling renovation, pulling down the last of the crown molding and ceiling tile pieces. It's not an easy job when you have to balance on a ladder and climb over furniture that can't easily be moved out of the way. The bead board ceiling on this side of the living room is not level in some places (no big surprise in this old house) and will require some thoughtful tweaking before Neil can even begin to install the tin ceiling tiles. It's slow going but it's getting there. Stay tuned.